Products and Services

Custom Air Handlers

  • 400 CFM to 300,000 CFM (and larger…)
  • Commercial Applications
  • Industrial Applications
  • Architectural Profiled Units
  • Heat Recovery
  • Packaged DX
  • Custom Profiles and Custom Aspect Ratios
  • Full Service Corridors and Service Vestibules
  • External Piping Vestibules
  • Stacked Units
  • Side by Side Units
  • Vertical Units
  • Multi-Directional Splits
  • Multiple Fans
  • Redundant Air Tunnels
  • Dehumidification Units
  • Water Treatment Facilities
  • Explosion Proof [Hazardous Area Classification]

Heating and Cooling

  • Heating
    • Electric Heaters
    • Direct or Indirect Gas Fired Heaters
    • Hot Water
    • Steam
  • Cooling
    • Chilled Water
    • Refrigerant with Optional Low Ambient DX Cooling to -40 deg.
    • Evaporative Cooling
      • For humidification applications
      • For direct cooling & indirect cooling
    • Humidifiers

Heat Recovery

  • Heat Wheels
  • Heat Pipes
  • Run Around Pipes
  • Plate Air to Air Heat Exchangers

Factory Installed Control Options

  • Factory Mounted Wiring Raceways and J-boxes for Field Control Wiring
  • Factory Installed Sensors, Actuators, Controllers
  • Factory Installed and Programmed DDC Controllers
  • Factory Installed and Programmed PLC Controllers

Electrical

  • Single Point Power Panels
  • Variable Frequency Drives
  • Standard and EC Motors
  • Conduit Runs

Filtration

  • Standard and High MERV Rated Filtration
  • Ultra-Violet Lights
  • HEPA Filtration
  • Bag-In/Bag-Out
  • Gas Phase
  • Electronic Filtration
  • Standard or Angled Filter Racks

Corrosion Protection

  • Stainless Steel, Copper or Heresite/Electrofin ® Coated Coils
  • Galvanized, Aluminum or Stainless Steel Unit Construction
  • Multiple Liner Options in Wet Sections
  • Wash-down Liners

Critical Quality Assurance

  • ETL Listed
  • CWB Certification – 2010
  • Components to ARI, AMCA Standards
  • P&ID Drawing Management
  • Market Leading Casing Performance for Leakage and Deflection
    • Deflection test < L/300 at 10 inches
    • Leakage less than 0.75 percent at 1.5 times the Operating Pressure
  • Water Dam and Welded Floor Construction
    • Continuous seam welded on all floor panels, penetrant dye tested
    • 1.5 inch water dam on floor openings and perimeter
    • Floor drains offered in all sections
  • Factory Testing Offered
    • Leakage
    • Deflection
    • Floor water flood containment
    • Airflow verification
    • Sound “Free Field”
    • High Potential